ISSN: 3070-2607
ICCK Transactions on Electric Power Networks and Systems is a peer-reviewed journal dedicated to the advancement of knowledge in the field of electric power systems and networks.
DOI Prefix: 10.62762/TEPNS

Journal Metrics

-
Impact Factor
-
CiteScore

Recent Articles

Free Access | Research Article | 26 September 2026
Seasonal Ampacities of 110 kV Power Cables Installed in Various Trenches Surrounded by Two-Layered Native Soil
ICCK Transactions on Electric Power Networks and Systems | Volume 2, Issue 3: 161-174, 2026 | DOI: 10.62762/TEPNS.2026.878901
Abstract
In analytical and numerical calculations of the underground cable ampacities in accordance with the relevant IEC standards and the IEC technical report, it is usually assumed that the native soil, cable bedding, and other materials used in and around cable trenches are homogeneous, although this is not the case in reality. This paper, however, assumes that the native soil consists of two horizontal layers with different thermal conductivities. The upper native soil layer includes soil material as well as shrinkage cracks between the ground surface and the horizontal plane where the reference soil temperature is measured, whereas the lower native soil layer includes only soil material below t... More >

Graphical Abstract
Seasonal Ampacities of 110 kV Power Cables Installed in Various Trenches Surrounded by Two-Layered Native Soil
Free Access | Research Article | 12 September 2026
Comparative Analysis of Smart Meter Testing According to International Standards with AI-Based Methods for Anomaly Detection
ICCK Transactions on Electric Power Networks and Systems | Volume 2, Issue 3: 149-160, 2026 | DOI: 10.62762/TEPNS.2026.407661
Abstract
Standard type verification of three-phase smart meters is performed under idealized balanced test conditions that do not fully reproduce the current unbalance, single-phase loading and voltage deviations found on real distribution networks, so that a channel-specific calibration fault can pass undetected. This paper presents a methodology combining standard IEC~62052-11 and EN~50470-3 verification with an extended set of near-real-network test conditions (unbalanced current distribution, single-phase loading, and voltage deviation from nominal), together with a statistical/machine-learning screening step applied to aggregated laboratory verification results and used to flag units for target... More >

Graphical Abstract
Comparative Analysis of Smart Meter Testing According to International Standards with AI-Based Methods for Anomaly Detection
Free Access | Editorial | 07 September 2026
Drought of 2026 and Its Impact on Various Forms of Electricity Generation in the Danube Basin
ICCK Transactions on Electric Power Networks and Systems | Volume 2, Issue 3: 138-148, 2026 | DOI: 10.62762/TEPNS.2026.267862
Abstract
From the confluence of the Lech River with the Danube to the Danube Delta, installed electricity generation capacities of approximately 16.983~GW directly use water from the Danube, namely: 6096.34~MW hydro, 4657.7~MW gas-fired (including one combined heat and power PP fueled primarily by natural gas and hydrogen), 1007~MW coal-fired and 5222~MW nuclear power plants (PPs). As is well known, hydro PPs use water to spin turbines, gas-fired PPs use water to cool and generate steam, coal-fired PPs use water to generate steam, cool equipment, and manage waste, while nuclear PPs use water to cool and generate steam, as well as to moderate fast-moving neutrons. If there is a record-low water level... More >

Graphical Abstract
Drought of 2026 and Its Impact on Various Forms of Electricity Generation in the Danube Basin
Free Access | Research Article | 01 September 2026
RLC Circuit-based Detection of Subharmonics, Interharmonics, and Harmonics in Current and Voltage Waveforms
ICCK Transactions on Electric Power Networks and Systems | Volume 2, Issue 3: 128-137, 2026 | DOI: 10.62762/TEPNS.2026.598621
Abstract
This paper presents a simple and efficient method for detecting harmonics, interharmonics, and subharmonics in voltage and current waveforms. The proposed technique is based on a series RLC resonant circuit and is characterized by its simplicity, relatively fast response, and ease of implementation. The performance of the proposed method is validated using both mathematically generated signals with severe waveform distortion and signals measured in real distribution networks with high penetration of renewable energy sources. The maximum relative errors in the frequency of detected harmonic components were 1.33% for the mathematically generated strongly distorted signals and 0.60% for the mea... More >

Graphical Abstract
RLC Circuit-based Detection of Subharmonics, Interharmonics, and Harmonics in Current and Voltage Waveforms
Free Access | Research Article | 03 August 2026
Influence of Current-Dependent AC Resistance and Emissivity on Temperature Estimation of a Single-Layer ACSR Conductor
ICCK Transactions on Electric Power Networks and Systems | Volume 2, Issue 3: 116-127, 2026 | DOI: 10.62762/TEPNS.2026.632689
Abstract
This paper investigates the influence of temperature- and current-dependent variations in alternating current (AC) resistance on the estimation of the operating temperature of aluminium conductor steel-reinforced (ACSR) conductors, with particular emphasis on the differences arising from the use of tabulated and experimentally determined resistance characteristics. Special attention is devoted to the current dependence of AC resistance in the single-layer ACSR conductor 48-AL1/8-ST1A, where pronounced resistance variations occur due to the electromagnetic interaction between the aluminum strands and the steel core. Experimental investigations were conducted under controlled laboratory condit... More >

Graphical Abstract
Influence of Current-Dependent AC Resistance and Emissivity on Temperature Estimation of a Single-Layer ACSR Conductor
Free Access | Editorial | 23 June 2026 | Cited: Crossref logo  1
Towards Installing the First Lunar Microgrid
ICCK Transactions on Electric Power Networks and Systems | Volume 2, Issue 2: 107-115, 2026 | DOI: 10.62762/TEPNS.2026.822786
Abstract
The US National Aeronautics and Space Administration's (NASA) Artemis II lunar flyby mission paved the way for future moon landings and directed research toward installing the first lunar microgrid. NASA predicts that a solar-powered microgrid at the lunar South Pole (LunaGrid) will become operational in 2028 and will interconnect multiple nodes to support the Artemis Base Camp. The architecture of the LunaGrid microgrid will be modular for the integration of several fission reactors (in one nuclear power plant of up to 100 kW). The aim is to ensure a continuous supply of electricity to the Artemis Base Camp by 2030 during the 14-day lunar nights when solar power is not available. In additio... More >

Graphical Abstract
Towards Installing the First Lunar Microgrid
Free Access | Research Article | 16 June 2026
Safety-Oriented Multi-Parameter Monitoring and Response Time Assessment of Battery Energy Storage Systems
ICCK Transactions on Electric Power Networks and Systems | Volume 2, Issue 2: 89-106, 2026 | DOI: 10.62762/TEPNS.2026.458291
Abstract
The rapid integration of battery energy storage systems (BESS) into modern power grids necessitates robust safety architectures to prevent catastrophic failures such as thermal runaway. Current diagnostic frameworks are often reliant on isolated, single-parameter thresholds and lack direct linkage to hardware-level execution. This work proposes a comprehensive, multi-parameter early warning and hierarchical protection methodology that bridges the gap between software-based fault detection and practical electromechanical response. The proposed algorithm calculates a dynamic, weighted safety score in real-time by structurally integrating internal battery management system (BMS) metrics, such a... More >

Graphical Abstract
Safety-Oriented Multi-Parameter Monitoring and Response Time Assessment of Battery Energy Storage Systems
Free Access | Research Article | 03 June 2026
Experimental Comparative Analysis of Electromechanical, Static and Microprocessor Relay Protection Technologies
ICCK Transactions on Electric Power Networks and Systems | Volume 2, Issue 2: 79-88, 2026 | DOI: 10.62762/TEPNS.2026.788018
Abstract
This paper presents an experimental comparative analysis of electromechanical, static, and microprocessor-based protective relays using the secondary injection testing method. The study evaluates key performance indicators, including pickup current, dropout current, and operating time, under controlled laboratory conditions. The results show that electromechanical relays exhibit pickup current deviations below 5\%, accompanied by relatively high variability in operating time (up to 0.2 s), mainly due to inherent mechanical limitations. Static relays demonstrate improved performance, with enhanced stability, reduced deviations, and limited time variation within ±0.1 s. Microprocessor-based r... More >

Graphical Abstract
Experimental Comparative Analysis of Electromechanical, Static and Microprocessor Relay Protection Technologies

Journal Statistics

37
Authors
9
Countries / Regions
25
Articles
31
Scopus Citations
52% Cited
2025
Published Since
40,528
Article Views
10,379
Article Downloads
ICCK Transactions on Electric Power Networks and Systems
ICCK Transactions on Electric Power Networks and Systems
eISSN: 3070-2607
Crossref
Crossref
Member of Crossref
Visit Crossref →